Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Aghazadeh, Hadi | Zare, Alireza | Akbari-Zadeh, Mohammad-Reza | Zare, Jafar
Affiliations: Department of Electrical Engineering, Sarvestan Branch, Islamic Azad University, Sarvestan, Iran | Bahonar Technical College Affiliated to Technical and Vocational University, Shiraz, Iran
Note: [] Corresponding author. Mohammad-Reza Akbari-Zadeh, Bahonar Technical College Affiliated to Technical and Vocational University, Shiraz, Iran. Tel./Fax: +98 7115643674; E-mail: M.akbari.rec@gmail.com
Abstract: In this paper, a novel two-stage modification firefly Optimization algorithm (MFA) is proposed for the placement of Proton Exchange Membrane Fuel Cell Power Plants (PEM-FCPP) in distribution systems. FCPPs, as Distributed Generation (DG) units, can be taken into account as combined sources of Heat, Power, and Hydrogen (CHPH). The overall system efficiency can be improved by CHPH operation of FCPPs. Also, it will produce hydrogen which can be stored for the future use of FCPPs or can be sold to make a profit. The objective functions under investigation consist of the operating costs of electrical energy generation of distribution substations and FCPPs, the voltage deviation and the total emission. In this paper, only the placement of CHPH FCPPs is considered while investment cost of devices is not considered. Owing to the different, non-commensurable and nonlinear objectives, using conventional single-objective approaches makes difficulties to solve the problem. Other than that, the placement of FCPP in distribution systems is a mixed integer problem. Therefore, in order to overcome these problems, the firefly algorithm is utilized. In addition, a new two-stage modification is employed to search the problem area globally. Due to the multi-objective characteristic of the optimization, implementing the proposed MFA leads to obtain a set of solution in the problem instead of only one. The proposed algorithm is tested on a 69-bus distribution system to validate the effectiveness and impressiveness of the approach.
Keywords: Fuel cell power plant (FCPP), combined heat, power and hydrogen (CHPH), multi-objective optimization, distributed generation (DG)
DOI: 10.3233/IFS-141263
Journal: Journal of Intelligent & Fuzzy Systems, vol. 27, no. 6, pp. 3059-3066, 2014
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
sales@iospress.com
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
info@iospress.nl
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office info@iospress.nl
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
china@iospress.cn
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
如果您在出版方面需要帮助或有任何建, 件至: editorial@iospress.nl