Erratum to: Structuring the simulation for participation during design: Designing integrated operations centers in the oil industry – A case study
[WORK: A Journal of Prevention, Assessment & Rehabilitation vol. 73, no. s1, pp. S253-S264, 2022. DOI: 10.3233/WOR-211135]
https://content.iospress.com/articles/work/wor211135
When this article was first published, the funding statement was incomplete. The funding statement should be:
Funding
This study was financed in part by the Coordenação de Aperfeiçoamento de Pessoal de Nível Superior – Brasil (CAPES) – Finance code 001 and Fundação de Amparo à Pesquisa do Estado do Rio de Janeiro (FAPERJ) – Finance code E-26/210.621/2019.