Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Li, Lixina; b | Lv, Yana; b; * | Sun, Boa; b | Wang, Miaoa; b | Chen, Binc | Li, Zekec | Fan, Haiweic
Affiliations: [a] China Electric Power Research Institute, Beijing, China | [b] Beijing Key Laboratory of Research and System Evaluation of Power Dispatching Automation Technology, Beijing, China | [c] State Grid Fujian Electric Power Company, Fuzhou, Fujian, China
Correspondence: [*] Corresponding author: Yan Lv, China Electric Power Research Institute, Beijing 100192, China. E-mail: lvyan@epri.sgcc.com.cn.
Abstract: Against the backdrop of global attention to climate change and environmental sustainability, the development timing and comprehensive cost of regional renewable energy power generation projects have become a focus of attention. By constructing effective models to evaluate them, it can help promote the healthy development of renewable energy projects. The research aims to quantitatively evaluate the development status of local renewable energy projects by constructing a comprehensive evaluation model, minimize information loss, and improve the accuracy of evaluation results. This study adopted a comprehensive evaluation model that combines Analytic Hierarchy Process (AHP) based on accelerated genetic algorithm, entropy weight method, and ideal point method. Firstly, the subjective weights of the development evaluation indicators for regional renewable energy power generation projects are calculated. Secondly, the entropy weight method is used to analyze the trend of each indicator and obtain objective weights. Finally, combined with the objective weights and the evaluation results calculated using the TOPSIS method, a comprehensive evaluation of renewable energy power generation projects in various regions is conducted. Through analysis, the core indicators of the development level of renewable energy power generation projects in various regions show specific performance, such as Hebei’s evaluation value of 0.4945 in the proportion of comprehensive energy development, and Inner Mongolia’s evaluation value of 0.4045 in the proportion of comprehensive energy installed capacity. Meanwhile, genetic optimization methods exhibit significant advantages in the calculation of optimization schemes compared to dynamic programming methods, possessing strong global search capabilities and high-precision solutions. This study provides a new research method and approach for the evaluation of regional renewable energy power generation projects, demonstrating the practical value and certain advantages of the research method.
Keywords: Integrated evaluation model, timing optimization, energy system, renewable energy, power generation projects, sustainable, AGA-AHP
DOI: 10.3233/JCM-247173
Journal: Journal of Computational Methods in Sciences and Engineering, vol. 24, no. 1, pp. 19-36, 2024
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
sales@iospress.com
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
info@iospress.nl
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office info@iospress.nl
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
china@iospress.cn
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
如果您在出版方面需要帮助或有任何建, 件至: editorial@iospress.nl