Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Zhu, Huiqia | Jiang, Tianhuaa; b; * | Wang, Yufangc | Deng, Guanlongd
Affiliations: [a] School of Transportation, Ludong University, Yantai, Shandong, P.R. China | [b] Key Laboratory of Symbolic Computation and Knowledge Engineering of Ministry of Education, Jilin University, Changchun, P.R. China | [c] School of Automation, Nanjing University of Information Science & Technology, Nanjing, Jiangsu, P.R. China | [d] School of Information and Electrical Engineering, Ludong University, Yantai, Shandong, P.R. China
Correspondence: [*] Corresponding author. Tianhua Jiang, School of Transportation, Ludong University, Yantai, Shandong 264025, China; Key Laboratory of Symbolic Computation and Knowledge Engineering of Ministry of Education, Jilin University, Changchun, 130012, P.R. China. Email: jth1127@163.com.
Abstract: For the job shop with variable processing speeds, the aim of energy saving and consumption reduction is implemented from the perspective of production scheduling. By analyzing the characteristics of the workshop, a multi-objective mathematical model is established with the objective of reducing the total energy consumption and shortening the makespan. A multi-objective discrete water wave optimization (MODWWO) algorithm is proposed for solving the problem. Firstly, a two-vector encoding method is adopted to divide the scheduling solution into two parts, which represent speed selection and operation permutation in the scheduling solution, respectively. Secondly, some dispatching rules are used to initialize the population and obtain the initial scheduling solutions. Then, three operators of the basic water wave optimization algorithm are redesigned to make the algorithm adaptive for the multi-objective discrete scheduling problem under study. A new propagation operator is presented with the ability of balancing global exploration and local exploitation based on individual rank and neighborhood structures. A novel refraction operator is designed based on crossover operation, by which each individual can learn from the current best individual to absorb better information. And a breaking operator is modified based on the local search strategy to enhance the exploitation ability. Finally, extensive simulation experiments demonstrate that the proposed MODWWO algorithm is effective for solving the considered energy-saving scheduling problem.
Keywords: Job shop, energy-saving scheduling, total energy consumption, makespan, multi-objective discrete water wave optimization
DOI: 10.3233/JIFS-201522
Journal: Journal of Intelligent & Fuzzy Systems, vol. 40, no. 6, pp. 10617-10631, 2021
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
sales@iospress.com
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
info@iospress.nl
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office info@iospress.nl
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
china@iospress.cn
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
如果您在出版方面需要帮助或有任何建, 件至: editorial@iospress.nl