Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Basiri, Mohammad-Alia | Alinezhad, Esmaeilb; * | Tavakkoli-Moghaddam, Rezac | Shahsavari-Poure, Nasserd
Affiliations: [a] Department of Industrial Engineering, Islamic Azad University, South Tehran Branch, Tehran, Iran | [b] Department of Industrial Engineering, Shiraz University of Technology, Shiraz, Iran | [c] School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran | [d] Department of Industrial Engineering, Vali-e-Asr University, Rafsanjan, Iran
Correspondence: [*] Corresponding author. Esmaeil Alinezhad, Department of Industrial Engineering, Shiraz University of Technology, Shiraz, Iran. E-mail: alinezhad@sutech.ac.ir.
Abstract: This paper presents a multi-objective mathematical model for a flexible job shop scheduling problem (FJSSP) with fuzzy processing times, which is solved by a hybrid intelligent algorithm (HIA). This problem contains a combination of a classical job shop problem with parallel machines (JSPM) to provide flexibility in the production route. Despite the previous studies, the number of parallel machines is not pre-specified in this paper. This constraint with other ones (e.g., sequence-dependent setup times, reentrant workflows, and fuzzy variables) makes the given problem more complex. To solve such a multi-objective JSPM, Pareto-based optimization algorithms based on multi-objective meta-heuristics and multi-criteria decision making (MCDM) methods are utilized. Then, different comparison metrics (e.g., quality, mean ideal distance, and rate of achievement simultaneously) are used. Also, this paper includes two major phases to provide a new model of the FJSSP and introduce a new proposed HIA for solving the presented model, respectively. This algorithm is a hybrid genetic algorithm with the SAW/TOPSIS method, namely HGASAW/HGATOPSIS. The comparative results indicate that HGASAW and HGATOPSIS outperform the non-dominated sorting genetic algorithm (NSGA-II) to tackle the fuzzy multi-objective JSPM.
Keywords: Flexible job shop scheduling, multi-objective optimization, sequence-dependent setup times, multi-criteria decision making, hybrid intelligent algorithms.
DOI: 10.3233/JIFS-201120
Journal: Journal of Intelligent & Fuzzy Systems, vol. 39, no. 5, pp. 7769-7785, 2020
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
sales@iospress.com
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
info@iospress.nl
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office info@iospress.nl
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
china@iospress.cn
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
如果您在出版方面需要帮助或有任何建, 件至: editorial@iospress.nl