Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Sarvestani, Mohammad Reza Edalata | Shahraki, Mohammad Rezab | Anisseh, Mohammadc; *
Affiliations: [a] Department of Industrial Engineering, Sistan and Baluchestan University, Zahedan, Iran | [b] Department of Industrial Engineering, Sistan and Baluchestan University, Zahedan, Iran | [c] Department of Industrial Management, Imam Khomeini International University, Iran
Correspondence: [*] Corresponding author. Mohammad Anisseh, Assistant Professor, Department of Industrial Management, Imam Khomeini International University, Iran. Tel.: +98 9121467582; E-mail: manisseh@soc.ikiu.ac.ir.
Abstract: Since the successful performance of the projects results from their complicated nature and internal non-reliability, risk evaluation for gaining success in management and project performance, is a required factor. In reality, due to the complicated nature of the projects and lack of specialized manpower, attaining comprehensive information in connection with project risks shall be difficult, while there is a little information about them. The Jackknife resampling method is therefore used meticulously to solve such problems and estimate the society parameter. In this paper, non-parameter Jackknife resampling method has been used for interval estimation of risks, considering the concept of the confidence interval and opinions of the specialists. Then evaluation and classification of major project risks have been made, using interval analysis method. A case study has also been presented to prove the efficiency of the proposed method and finally the comparison of the results of this method with those of Bootstrap sampling methods were presented. The results of this research have indicated that the proposed method not only plays an important role in lowering the expenses and is timely economical, but also gives more meticulous results in proportion to the Bootstrap sampling method.
Keywords: Project risks ranking, jackknife resampling method, interval analysis, construction project
DOI: 10.3233/IFS-151877
Journal: Journal of Intelligent & Fuzzy Systems, vol. 30, no. 5, pp. 2593-2600, 2016
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
sales@iospress.com
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
info@iospress.nl
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office info@iospress.nl
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
china@iospress.cn
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
如果您在出版方面需要帮助或有任何建, 件至: editorial@iospress.nl