Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Feylizadeh, Mohammad Rezaa; * | Mahmoudi, Amina | Bagherpour, Mortezab | Li, Deng-Fengc
Affiliations: [a] Department of Industrial Engineering, Shiraz Branch, Islamic Azad University, Shiraz, Iran | [b] Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran | [c] School of Economics and Management, Fuzhou University, Fuzhou, China
Correspondence: [*] Corresponding author. Mohammad Reza Feylizadeh, Department of Industrial Engineering, Shiraz Branch, Islamic Azad University, Shiraz, Iran. E-mail: Feylizadeh@iaushiraz.ac.ir.
Abstract: Project managers normally investigate how to reduce the total completion time of projects undertaken subject to the pre-determined objectives. The purpose of this paper is compression of total projects’ duration subject to influencing factors such as cost, time, quality and risk. In the present study, by considering factors affecting project success such as cost, time, quality and risk, project crashing and fast tracking are both employed then a fuzzy multi-objective non-linear model is proposed. Each project is associated with uncertainty and the lack of consideration of these uncertainties might lead to project failure. In addition, a fuzzy approach has been employed for incorporating the uncertainties associated with activities. In the proposed model, crashing and fast tracking of projects were considered simultaneously for the first time. According to a real case study considered in this paper, after using the proposed model, the cost of compression is also reduced. In addition, we determined which activities have to be crashed or fast tracked in order to attain the objective. The proposed methodology can be practically applied through mega projects such as construction and “Engineering, Procurement, and Construction” (EPC) projects where the deadline closes to being achieved. As another contribution, a unique feature of the proposed model is its capability for taking both crashing and fast-tracking simultaneously into consideration.
Keywords: Fuzzy multi-objective model, project crashing, fast tracking, time, cost
DOI: 10.3233/JIFS-18171
Journal: Journal of Intelligent & Fuzzy Systems, vol. 35, no. 3, pp. 3615-3631, 2018
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
sales@iospress.com
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
info@iospress.nl
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office info@iospress.nl
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
china@iospress.cn
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
如果您在出版方面需要帮助或有任何建, 件至: editorial@iospress.nl