Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Issue title: Special Section: Applied Machine Learning and Management of Volatility, Uncertainty, Complexity & Ambiguity (V.U.C.A)
Guest editors: Srikanta Patnaik
Article type: Research Article
Authors: Zhang, Yinglong | Hu, Hao*; | Xu, Feng
Affiliations: School of Naval Architecture, Ocean & Civil Engineering, Shanghai Jiao Tong University, Shanghai, P.R. China
Correspondence: [*] Corresponding author. Hao Hu, School of Naval Architecture, Ocean & Civil Engineering, Shanghai Jiao Tong University, 800 Dongchuan Road, Minhang District, Shanghai, 200240, P.R.China. E-mail: hhu@sjtu.edu.cn.
Abstract: Construction change management is an important part of construction project management. Previous studies usually focus on the various steps of construction change control: analyzing the causes of change, avoiding the risk of change, tracking the process of change, management and feedback of change. This study focused on improving the information flow and organizational relationship of the participants in the process of construction change management, which was reengineered with the use of Building Information Modelling (BIM) technology for better information integration. As BIM technology provides technical means for information transaction and management, a reengineered construction change management process based on BIM technology was proposed to form a more effective way of putting forward, examine, issuing, updating and archiving the information. Both the workflow and the organizational units involved in each work step were reengineered to improve the information flow. To verify the effect of process reengineering, Uncinet, a visual analysis tool for Social network analysis (SNA) was applied to quantitatively analyze and compare the traditional and BIM based organizational structure. The research results demonstrated that BIM was helpful to strengthen organizational coordination and information exchange in construction change management process.
Keywords: Construction change management, process reengineering, building information modelling, visual analysis, social network analysis
DOI: 10.3233/JIFS-179921
Journal: Journal of Intelligent & Fuzzy Systems, vol. 39, no. 2, pp. 1471-1480, 2020
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
sales@iospress.com
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
info@iospress.nl
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office info@iospress.nl
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
china@iospress.cn
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
如果您在出版方面需要帮助或有任何建, 件至: editorial@iospress.nl