Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Chitra, P.; | Rajaram, R.; | Venkatesh, P.
Affiliations: Department of Computer Science and Engineering, Thiagarajar College of Engineering, Madurai, India | IT Department, Thiagarajar College of Engineering, Madurai, India | Department of Electrical and Electronics Engineering, Thiagarajar College of Engineering, Madurai, India
Note: [] Corresponding author: P. Chitra, Tel.: +91 984 298 2776; E-mail: pccse@tce.edu.
Abstract: In a heterogeneous system, processor and network failure are inevitable and can have adverse effect on the complex applications executing on the systems. To reduce the rate of these failures, matching and scheduling algorithms should take into account the objectives of minimizing schedule length (makespan) and reducing the probability of failure. Equitable distribution of workload over resources contributes in reducing the probability of failure. The Heterogeneous Earliest Finish Time (HEFT) algorithm has been proved as a performance effective task scheduling algorithm, addressing the objective of minimizing makespan. Reliable Dynamic Level Scheduling (RDLS) algorithm is a bi-objective scheduling algorithm that maximizes the reliability more effectively. Though the reliable version of HEFT algorithm (RHEFT) considers failure rate in scheduling decision, the improvement in reliability is less, compared to that of RDLS. To overcome this deficiency, we propose to incorporate the task–processor pair finding step of RDLS in HEFT algorithm, since it meets both the objectives of minimizing the makespan and maximizing the reliability. We define the load on a processor as the amount of time the processor is engaged in completing the scheduled subtasks. In this paper, a modification to the HEFT is proposed as a new algorithm called Improved Reliable HEFT (IRHEFT) for minimizing the schedule length, balancing the load and maximizing the reliability of schedule. The algorithm is compared for its performance with RDLS algorithm for randomly generated task graphs and a real application task graph.
Keywords: Bi-objective scheduling, HEFT, RDLS, reliability, makespan
DOI: 10.3233/JHS-2011-0445
Journal: Journal of High Speed Networks, vol. 18, no. 1, pp. 33-45, 2011
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
sales@iospress.com
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
info@iospress.nl
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office info@iospress.nl
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
china@iospress.cn
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
如果您在出版方面需要帮助或有任何建, 件至: editorial@iospress.nl