Searching for just a few words should be enough to get started. If you need to make more complex queries, use the tips below to guide you.
Article type: Research Article
Authors: Zhang, Xingliang
Affiliations: Department of Architecture, Guangdong Xin’an Polytechnic, Shenzhen, Guangdong 518053, China | E-mail: gdszmrzhangxl@126.com
Correspondence: [*] Corresponding author: Department of Architecture, Guangdong Xin’an Polytechnic, Shenzhen, Guangdong 518053, China. E-mail: gdszmrzhangxl@126.com.
Abstract: At present, there are many problems in BIM monitoring of construction quality of large-scale construction projects. For example, it is easy to be affected by temperature and construction materials, which leads to errors in monitoring data, and then leads to unstable construction quality. In order to optimize the construction quality and efficiency of large-scale construction projects, a BIM (Building Information Modeling) monitoring model of construction quality of large-scale construction projects based on information technology is constructed. This model can solve the problem of low data quality in traditional BIM monitoring, thus ensuring the accuracy of monitoring results and ultimately improving the construction quality and efficiency of the project. The implementation steps of the model are as follows: After the user logs in the application program of the model on the computer side, the system function layer of the model selects the quality management function program. The data model layer combines the program selected by the user, extracts the model through the BIM monitoring data of construction quality based on the main crawler technology in the basic support layer, retrieves the construction quality monitoring data, and judges the fidelity of the data through the information synergy evaluation method of the construction quality chain model based on information technology. The qualified monitoring data are buffered and sent to the system function layer. The function layer evaluates the construction quality in combination with the monitored construction data and feeds it back to the user to realize BIM monitoring of construction quality. The test shows that after the model is applied, the qualified rate of construction quality of large-scale construction projects increases by 0.05%, and the total construction period is reduced by 5 days. The above results show that the construction quality BIM monitoring model of large-scale construction projects based on information technology can effectively improve the construction quality of large-scale construction projects, shorten the construction period, improve the construction efficiency, and play a positive role in the development of China’s construction industry.
Keywords: Genetic algorithm, construction quality, BIM, reptile technology, information collaborative evaluation
DOI: 10.3233/JCM-226555
Journal: Journal of Computational Methods in Sciences and Engineering, vol. 23, no. 1, pp. 267-284, 2023
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
sales@iospress.com
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
info@iospress.nl
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office info@iospress.nl
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
china@iospress.cn
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
如果您在出版方面需要帮助或有任何建, 件至: editorial@iospress.nl