Article type: Research Article
Authors: Hartman, A. | Bennett, C. | Matamoros, A. | Rolfe, S.
Affiliations: CEAE Department, University of Kansas, Lawrence, KS, USA
Note: [] Corresponding author. C. Bennett, Associate Professor, CEAE Department, University of Kansas, 1530W. 15th St., Lawrence, KS 66045, USA. E-mails: crb@ku.edu (C. Bennett); ahartman@ku.edu (A. Hartman); abm@ku.edu (A. Matamoros); srolfe@ku.edu (S. Rolfe).
Abstract: Cracking in web gaps of steel girder bridges is often difficult and expensive to repair, especially at the top web gap. A commonly-used retrofit technique involves creating new load path between a transverse connection plate and the top flange of the girder, by means of bolted angles on both sides of the transverse connection plate. This technique often requires removing portions of the bridge deck to create the bolted connection at the top flange, which is an approach that can incur significant expense and inconvenience to the traveling public. This study was aimed at evaluating the effectiveness of a newly-developed retrofit technique, in which connection is made between the transverse connection plate and the girder web, through use of bolted angles on both sides of the transverse connection plate and a backing plate on the opposing face of the girder web. The retrofit was evaluated through extensive structural testing and finite element modeling. Testing was performed on a 9.1-m [30-ft] long test bridge system, comprised of three 910-mm [36-in.] deep girders and a concrete deck. The system was loaded to produce distortion-induced fatigue cracking, and then the bridge was retrofitted with the newly-developed stiffener-to-web repair technique. Results of the testing were compared to findings from finite element analyses, as well as findings from structural tests performed on 2.7-m [9-ft.] long segments of similar girders tested under distortion-induced fatigue. Results have indicated that the newly-developed retrofit technique has significant potential for effectively controlling distortion-induced fatigue cracking in web gaps of steel girder bridges without requiring disruption to the concrete deck.
Keywords: Distortion-induced fatigue, fatigue, steel bridges, retrofit
DOI: 10.3233/BRS-130057
Journal: Bridge Structures, vol. 9, no. 2-3, pp. 57-71, 2013
IOS Press, Inc.
6751 Tepper Drive
Clifton, VA 20124
USA
Tel: +1 703 830 6300
Fax: +1 703 830 2300
sales@iospress.com
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
IOS Press
Nieuwe Hemweg 6B
1013 BG Amsterdam
The Netherlands
Tel: +31 20 688 3355
Fax: +31 20 687 0091
info@iospress.nl
For editorial issues, permissions, book requests, submissions and proceedings, contact the Amsterdam office info@iospress.nl
Inspirees International (China Office)
Ciyunsi Beili 207(CapitaLand), Bld 1, 7-901
100025, Beijing
China
Free service line: 400 661 8717
Fax: +86 10 8446 7947
china@iospress.cn
For editorial issues, like the status of your submitted paper or proposals, write to editorial@iospress.nl
如果您在出版方面需要帮助或有任何建, 件至: editorial@iospress.nl